- FKAA Duck Key WWTP
Duck Key, FL
- Seminole County RWTF at Yankeee Lake
Sanford, FL
- North Port WWTP Upgrade & Expansion
North Port, FL
- East Side Water Reclamation Facility
Clermont, FL
- Peace River Facility WTP Expansion
Arcadia, FL
- Cherry Point WRF Expansion
Okatie, SC
- Port of the Islands MBR Upgrade
Collier County, FL
- Sampey Road WWTP Expansion
Groveland, FL
- Minneola Water Reclamation Facility
Minneola, FL
- Lehigh Acres Wastewater Treatment Plant
Lehigh Acres, FL
- Wesley Center Subregional Reuse Faciliy
Wesley Chapel, FL
- Rockledge Reuse System - Phase VII
Rockledge, FL
- Loxahaahatchee River District WWTP
Jupiter, FL
- Fripp Island WWTP Expansion
Fripp Island, SC
- Eastern Regional WSF - Expansion
Orlando, FL
- North Collier County WRF Expansion
Naples, FL
- Land O' Lakes Wastewater Reuse Facility
Pasco County, FL
- Cobb Road Water Reclamation Facility
Brooksville, FL
- Sarasota Seawater Pumping Station
Sarasota, FL
-
• Columbia County Correctional WWTP
Lake City, FL
- • Cross City Correctional WWTP
Cross City, FL
- • Gulf County Correctional WWTP
Wewahitchka, FL
- • Point Washington WWTP
Okaloosa County, FL
- • Daleville Wastewater Treatment Plant
Daleville, AL
|
|
| |
|
| Project: |
East Side Water Reclamation Facility - Phase 2 |
| Value: |
$16,605,000 |
| Owner: |
City of Clermont |
| Engineer: |
Boyle Engineering Corporation |
Description: Work on this project included: modification of existing preliminary treatment structure and existing aeration basins, along with installation of a new Biofilter System, two Anoxic Basins, two Aeration Basins, new Mixed Liquor Splitter Box, two 65’ diameter Secondary Clarifiers, a new RAS/WAS Pump Station, two Chlorine Contact Tanks, one bulk Sodium Hypochlorite Storage Tank, two 2MG Concrete Ground Storage Tanks, a new Vertical Turbine Can Pump Station for reclaimed water distribution, a new 6,000 SF Operations Building, a new 8,000 SF Metal Maintenance Building, and miscellaneous piping, concrete, metals, painting, process equipment and piping installation. Self-performed 85% of the work including piping, concrete, metals, painting, process equipment and piping installation.
|
 |
|
|
|