- FKAA Duck Key WWTP
Duck Key, FL
- Seminole County RWTF at Yankeee Lake
Sanford, FL
- North Port WWTP Upgrade & Expansion
North Port, FL
- East Side Water Reclamation Facility
Clermont, FL
- Peace River Facility WTP Expansion
Arcadia, FL
- Cherry Point WRF Expansion
Okatie, SC
- Port of the Islands MBR Upgrade
Collier County, FL
- Sampey Road WWTP Expansion
Groveland, FL
- Minneola Water Reclamation Facility
Minneola, FL
- Lehigh Acres Wastewater Treatment Plant
Lehigh Acres, FL
- Wesley Center Subregional Reuse Faciliy
Wesley Chapel, FL
- Rockledge Reuse System - Phase VII
Rockledge, FL
- Loxahaahatchee River District WWTP
Jupiter, FL
- Fripp Island WWTP Expansion
Fripp Island, SC
- Eastern Regional WSF - Expansion
Orlando, FL
- North Collier County WRF Expansion
Naples, FL
- Land O' Lakes Wastewater Reuse Facility
Pasco County, FL
- Cobb Road Water Reclamation Facility
Brooksville, FL
- Sarasota Seawater Pumping Station
Sarasota, FL
-
• Columbia County Correctional WWTP
Lake City, FL
- • Cross City Correctional WWTP
Cross City, FL
- • Gulf County Correctional WWTP
Wewahitchka, FL
- • Point Washington WWTP
Okaloosa County, FL
- • Daleville Wastewater Treatment Plant
Daleville, AL
|
|
| |
|
| Project: |
Wesley Center Subregional Reuse Facility |
| Value: |
$24,569,696 |
| Owner: |
Pasco County Board of County Commissioners |
| Engineer: |
C & D Engineering, Inc. |
Description:
Expanding existing 3.0MGD facility to 6.0MGD. Work included: subsurface Compaction Grouting below structures; Channel Screen, Grit Chamber, Odor Control System; two 40' x 46' Anoxic Basins with Submersible Mixers; two 40' x 144' Aeration Basins with Fixed Vertical Shaft Surface Aerators and Recycle Pumps; one Duplex Recycle Pump Station; two 80' diameter Clarifiers; one Triplex RAS Pumping Station; four Duplex Deep Bed Dual Media Filters; one CMU Blower Building with Two Positive Displacement Blowers; one Dual Channel Chlorine Contact Chamber, two Vertical Turbine Transfer Pumps, one Duplex Vertical Turbine High Service Reuse Pump Station, two 70' diameter Sludge Holding Basins with Floating Surface Aerators, one 80' diameter Gravity Thickener, 3,100 sq.ft. Metal Dewatering Building with Belt Filter Press and Conveyors, 1,000 sq.ft. Expansion of existing Operations Building, 5,700 sq.ft. Maintenance Building, two Generators, and two Expanded and Lined Reject Ponds. Encore self-performed 80% of the work including piping, concrete, metals, painting, process equipment and piping installation.
This project received the 2008 AGC Horizon Award,
Municipal/Utility $15 - $30 million
|
 |
|
|
|