Project: Lakes Wales Airport Fire Flow Project
Value: $2,170,000
Owner: City of Lake Wales
Engineer: Boyle Engineering Corporation
Description: Installation of a Fire Protection System for Lake Wales Airport. It includes one 15” well, 1000’ deep that meets potable water standards, one 400,000 gallon steel storage tank and one Fire Pumping Skid with three 60 hp pumps. The water will be distributed through 2,600 lf of 16” force main and eight fire hydrants. Encore self-performed 50% of the work including piping, concrete, metals, painting, process equipment and piping installation.