Description:
Work included: Demolition, Site Work, Concrete, Pump Station Installation, Piping and Electrical at the Florida Fire House #3 Booster Pump Station and the Rockledge Florida Reuse System. Provided all labor, materials, equipment, tools and services necessary to provide owner with a reclaimed water booster pump station. Other work included approximately 4,000 lf of 8”, 510 lf of 6” and 160 lf of 12” reclaimed water distribution pipeline, including valves, fittings, asphalt pavement replacement, testing and other miscellaneous work as required. Encore self-performed 70% of the work including piping, concrete, metals, painting, process equipment and piping installation.