Project: Rockledge Reuse System - Phase VII
Value: $504,491
Owner: City of Rockledge
Engineer: Jones, Edmunds & Associates, Inc.
Description: Work included: Demolition, Site Work, Concrete, Pump Station Installation, Piping and Electrical at the Florida Fire House #3 Booster Pump Station and the Rockledge Florida Reuse System. Provided all labor, materials, equipment, tools and services necessary to provide owner with a reclaimed water booster pump station. Other work included approximately 4,000 lf of 8”, 510 lf of 6” and 160 lf of 12” reclaimed water distribution pipeline, including valves, fittings, asphalt pavement replacement, testing and other miscellaneous work as required. Encore self-performed 70% of the work including piping, concrete, metals, painting, process equipment and piping installation.
Rockledge Reuse System - Phase VII
 
blue line blue line
Home /  About Us /  Projects /  Career /  Bid Room /  Contact
Apply On Line /  Co-op /  Subcontractor /  Site Map /  Employee Log-In

© 2008-2012 Encore Construction Company. All rights reserved.